Find all needed information about Joint Support Ship Project. Below you can see links where you can find everything you want to know about Joint Support Ship Project.
https://www.canada.ca/en/department-national-defence/services/procurement/joint-support-ship.html
The Joint Support Ship (JSS) project will deliver two new ships, as outlined in Strong, Secured, Engaged, Canada’s defence policy. These Joint Support Ships are being built for the RCN under the National Shipbuilding Strategy and will replace the auxiliary oiler replenishment (AOR) vessels that reached the end of their operational lives.
https://en.wikipedia.org/wiki/Joint_support_ship
A joint support ship (JSS) is a multi-role naval ship capable of launching and supporting "joint" amphibious operations.It also provides sea-lift, underway support, sea-basing and logistics capabilities for combined army and naval missions.
https://www.defenseindustrydaily.com/canada-issues-rfp-for-cdn-29b-joint-support-ship-project-updated-02392/
Liberal Party Minister of National Defence Gordon O’Connor, Minister of Public Works and Government Services Michael Fortier and Chief of the Defence Staff General Rick Hillier announce the C$ 2.9 billion Joint Support Ship project for Canada’s Navy.
https://nss.seaspan.com/project/joint-support-ship/
The Joint Support Ships currently being constructed for the Royal Canadian Navy will be purpose-built, multi-role vessels that will provide an important auxiliary function to the Royal Canadian Navy. One of the most important aspects of these vessels is their ability to replenish naval task groups with marine fuel and other provisions while at sea.
https://www.tpsgc-pwgsc.gc.ca/app-acq/amd-dp/mer-sea/sncn-nss/interarmees-joint-eng.html
Project budget $3.4 billion (under review) Estimated delivery. Joint support ship 1: 2023; Joint support ship 2: 2025; Current status. Construction of large segments of the ship, known as early blocks, commenced in June 2018 to improve the schedule and mitigate a production gap within the shipyard
https://www.seaspan.com/building
An 86m Canadian Coast Guard (CCG) oceanographic research vessel, this ship will be deployed on Canada’s east coast. Once in service, the OOSV will develop hydrographic charts and bolster our understanding of the ocean’s physical environment. A single-ship of this class is to be constructed. Joint Support Ships (JSS)
https://navaltoday.com/2018/06/01/seaspan-to-begin-canadian-joint-support-ship-construction/
Jun 01, 2018 · Seaspan to begin Canadian Joint Support Ship construction. zoom An artist's rendering of the Joint Support Ship design. Photo: Royal Canadian Navy. Canadian shipbuilder Seaspan Shipyards has been awarded a CAD$66 million contract to start construction of Joint Support Ships (JSS) for the Royal Canadian Navy.
https://nationalpost.com/news/politics/construction-of-canadian-navys-supply-ships-delayed-until-2019-liberal-report-reveals
Jan 15, 2018 · Construction of Canadian navy's supply ships delayed until 2019, Liberal report reveals The navy had hoped to get the first ship in 2021 and the second in 2022.Author: David Pugliese, Ottawa Citizen
http://www.thefullwiki.org/Joint_Support_Ship_Project
The Joint Support Ship Project [2] (abbreviated as JSS Project) is a project undertaken by the Canadian Forces to provide Canada with three multirole naval vessels. The Joint Support Ship will enable a Naval Task Group to remain at sea for up to six times longer than is currently possible.Operators: Canadian Forces Maritime, Command
https://www.canada.ca/en/department-national-defence/services/procurement/joint-support-ship.html
The Joint Support Ship (JSS) project will deliver two new ships, as outlined in Strong, Secured, Engaged, Canada’s defence policy. These Joint Support Ships are being built for the RCN under the National Shipbuilding Strategy and will replace the auxiliary oiler replenishment (AOR) vessels that reached the end of their operational lives.
https://en.wikipedia.org/wiki/Joint_support_ship
A joint support ship (JSS) is a multi-role naval ship capable of launching and supporting "joint" amphibious operations.It also provides sea-lift, underway support, sea-basing and logistics capabilities for combined army and naval missions.
https://www.defenseindustrydaily.com/canada-issues-rfp-for-cdn-29b-joint-support-ship-project-updated-02392/
Liberal Party Minister of National Defence Gordon O’Connor, Minister of Public Works and Government Services Michael Fortier and Chief of the Defence Staff General Rick Hillier announce the C$ 2.9 billion Joint Support Ship project for Canada’s Navy.
https://nss.seaspan.com/project/joint-support-ship/
The Joint Support Ships currently being constructed for the Royal Canadian Navy will be purpose-built, multi-role vessels that will provide an important auxiliary function to the Royal Canadian Navy. One of the most important aspects of these vessels is their ability to replenish naval task groups with marine fuel and other provisions while at sea.
https://www.tpsgc-pwgsc.gc.ca/app-acq/amd-dp/mer-sea/sncn-nss/interarmees-joint-eng.html
Project budget $3.4 billion (under review) Estimated delivery. Joint support ship 1: 2023; Joint support ship 2: 2025; Current status. Construction of large segments of the ship, known as early blocks, commenced in June 2018 to improve the schedule and mitigate a production gap within the shipyard
https://en.wikipedia.org/wiki/Joint_Support_Ship
A joint support ship (JSS) is a multi-role naval ship capable of launching and supporting "joint" amphibious operations.It also provides sea-lift, underway support, sea-basing and logistics capabilities for combined army and naval missions.
Need to find Joint Support Ship Project information?
To find needed information please read the text beloow. If you need to know more you can click on the links to visit sites with more detailed data.